Prime Contractor to provide all necessary labor, equipment, and materials to construct a new Corrosion Control Facility (including an industrial wastewater treatment plant) to support painting, stripping, cleaning, and maintenance of various aircraft. Scope components included hardened steel structure, service transformer, distribution boards, panel boards, critical HVAC system, modification and repair of runway beside facility, and masonry work.
Project type: International
Generator Workshop Upgrade | Cairo, Egypt
Construction of a generator maintenance building; concrete hard stand; paint and bead blast building; battery shop and steam wash building; load test shed; fuel pump island; and all associated site work and utilities including a water storage tank and a fire pump facility.
Eastern Primary Water Transmission | Zatary, Jordan
This project focused on critical system components of municipal water supply facilities within the service area of the Northern Governorates Water Authority (NGWA), the Eastern Primary Transmission System. This component forms the “backbone” of the NGWA eastern system, and expansions were needed in order to keep up with the expected increase in demand. The project comprised two components: the supply, delivery, construction and pre-commissioning of a new pump station at Zatary, and a new 48km pipeline extending west from the new Zatary pump station to the existing reservoir at Hofa. The project area covered the Governorates of Mafraq, Jerash and Irbid. Specific components included:
– Construction of a new pump station at Zatary in Mafraq Governorate, including 4 new Turbin pumps (3 service and 1 standby) each of a 720 m3 /hr capacity.
– Construction of a control building at Zatary pump station, including installation of control equipment.
– Installation of the new Zatary pump station yard piping comprising a steel 1200mm pump suction header and 1000 mm discharge header.
– Civil and landscaping works at the Zatary pump station site.
– Supply and installation of approximately 47,800m of ductile iron pipe pipeline and tak-offs ranging in size from 100mm to 1000mm diameter with all fittings and accessories including air release valves, gate valves, butterfly valves,wash outs.
– GPRS based telemetry system between the Zatary pump station and Hofa reservoir including intermediate control points.
Expansion of Aqaba Water Facilities | Aqaba, Jordan
Prime Contractor for upgrading and expanding existing water facilities, including reservoirs, pressure reducing stations, and installation of distribution lines.
– Construction of pressure Break Tanks no. 1, and 2 with a capacity of 750 m3 each.
– Construction of New Reservoirs – High Terminal Reservoir, 3,600 m3 , South High Reservoir, 3,600 m3, South Low Reservoir, 6,800 m3.
– Modifications to existing Reservoirs – Low Terminal Reservoir, High and Low North Reservoir.
– Construction of 9 Pressure Reducing stations.
– Installation of about 57 km of ductile iron transmission lines, about 220 km of network distribution system, and 8000 house connections.
– Installation of Supervisory Control and Data Acquisition System (SCADA).