Buildout of the interior section of an occupied building consisting of approximately 21,700 SF plus a 2,400 SF mezzanine.
Space was located between two existing and occupied government offices requiring noise control, building access, and logistics along with public safety. Construction included installation of elevator shaft and pit to accommodate new elevator.